02/06/2020 - 10:59 am

Caldwell beam lifts rebar cages on overpass project

The Caldwell Group Inc supplied a custom 75ft long, 50,000lb capacity beam for lifting 60 rebar cages at a highway project in Philadelphia, Pennsylvania.

The two-piece beam is currently being used beneath the hook of a 275USt capacity Grove mobile crane to lift the large pier cap rebar cages, as required for concrete reinforcement during the rebuild of an 8500ft long, 100ft wide overpass. The cages vary in weight, up to 46,000lb, and length, up to 85ft.

The beam was delivered to James J Anderson Construction Co Inc (JJA), which is delivering a scope of work to Commonwealth of Pennsylvania, Department of Transportation (PennDOT) to construct a two-mile elevated roadway, with ramps, drainage, and associated utilities and civil engineering works. JJA is using its Anderson-owned crane fleet.

Tom Eicher, director of engineering at Caldwell, says, “The beam was designed, manufactured and built in two sections, due to the overall pick length required. It can be used both bolted together at its full length or in individual sections, if required. The rebar cages require support at multiple points from the lifting beam by means of the lower rigging. Multiple lower rigging lugs allow riggers to distribute the weight of the cage to minimize cage deformation. This allows for proper control while handling the lifted load when positioning the rebar cage.”

He added that the upper rigging design arrangement helps further support the lifting beam. The lower lugs are sized for a minimum of three points used to pick up the load. There are 10 lower lug lift points on the full 75ft long assembly, while JJA can use any combination as needed to distribute the load as per their lift plans.

Caldwell supplied the two two-leg chain slings above the beam that are rigged at angles to share the load when both sections of the lifting beam are bolted together and used as an assembly. The synthetic slings above (connected to the crane’s hook) and beneath the beam (connected to the cages), are supplied by JJA. Sling angles were determined during the design process.

“The end hooks are able to attach rigging at a maximum of a 30deg rigging angle,” Eicher said. “Note that the end hooks are de-rated for that 3degr angle if required to be used. Ultimately the span beyond 75ft is dependent on the rigging length employed [by JJA].”

The beam was painted in standard Caldwell paint and JJA manages storage onsite in between lifts. Eicher added that an in-service inspection program was established by the end user based on the amount of use in line with ASME B30.20 recommendations.

PennDOT oversees programs and policies affecting highways, urban and rural public transportation, airports, railroads, ports, and waterways. The project continues and is scheduled for completion next year.


New Issue

LHI March 2024